中文
English

Transportation — Four-way Road and Bridge

2022-07-01

605The starting point of the reconstruction and expansion project of the section from Tongli to Lili on Provincial Road in Wujiang is located at the junction of Wujiang District and Wuzhong District (Dayao Bridge). It runs southward along the existing Sutongli Highway, and the end point is at the Lianmengcun Bridge on Sutongli Highway. The total length of the route is17.694km, all of which are the reconstruction and expansion of the old road.

Anruixin Smart Power Distribution is committed to users' safe, smart and energy - saving electricity consumption. Anruixin Smart Temporary Power is safer than traditional temporary power, with more comprehensive protection and more convenient for on - site users.


share